Which job should your firm systemise first?

Pick the jobs that take your team's time, answer four questions about each, and get a ranked list. It takes about five minutes and nothing you enter leaves this page.

1 of 4

What kind of firm are you?

This sets the list of jobs on the next screen.

2 of 4

Which jobs take the most time?

Choose two to six. Pick the ones your juniors would name first.

3 of 4

Four questions about each job

Answer for how the job runs today, at your firm.

4 of 4

Start with this one.

Talk it through →

How the score is worked out

A job is a good first build when it comes round often, takes real time, produces the same kind of output each time, and draws on inputs that already sit in files the firm controls. Each answer scores one to three points, and the four answers are weighted.

QuestionWeightWhy it matters
How often the job comes round3A system that runs weekly is tuned in a month. One that runs twice a year never is.
How standard the output is3A fixed template gives the system something to be right against, and gives the reviewer a fixed place to look.
Hours each time2The size of what comes back.
Where the inputs live2Inputs kept in heads and inboxes have to be moved into files before anything can be built on them.

The score runs from 0 to 100. Above 75 is a strong first build. Between 50 and 75 is a good second. Below 50, something has to change before a build would repay itself, and the result says which thing.

The scorecard does not ask how costly a mistake is, because every job on these lists ends in a document a senior person signs. That review stays whatever is built. The numbers check covers how to do it quickly.

This is a ten-minute version of what we do in the first two weeks of an engagement, where the hours are measured and not estimated. If you want a second opinion on your ranking, book a briefing.